Resolution:Standard | High | Highest
Icon Equipment - Slide Rail Shoring Instal...
 
 
 
 
 
Homepage > Entertainment > Icon Equipment - Slide Rail Shoring Installation Video on the J

Icon Equipment - Slide Rail Shoring Installation Video on the J

You need Flash player 8+ and JavaScript enabled to view this video.
E-mail to Friends
Post to FacebookPost to MySpaceThumbs UpThumbs Down
Email this video to your friends
 
Video Details
Comments (0)
 
 
in the Bowery Bay Waste Water Treatment Plant, Queens, NY. The Contractor installing Icon's Slide Rail System is Frontier Kemper Construction of Pelham, NY. The size of the slide rail system installed was a 3 bay 4 sided pit, 65' long x 20.50' wide x 20'deep for the installation of several 30' long sections of 72 steel pipe on concrete cradle and wooden piles. Icon's Roller Rail System was chosen for it's unique ability to move up and down the face of the rail giving the contractor ...

Uploaded Aug. 5, 2009

By: crazycrandall

0

Views: 4

Share And Linking
 
Copy and paste this link into an email or instant message
Copy and paste this code to embed this video into your website or blog
Email this video to your friends
 
Who's Linking
There are currently no sites linking to this video. Copy the code below and be the first site to link or embed the video!
Top Sites Linking To This Video:
 
Top Rated Comments
 
There are no rated comments for this video. Rate a comment now.


IsShowcaseCDP = false