in the Bowery Bay Waste Water Treatment Plant, Queens, NY. The Contractor installing Icon's Slide Rail System is Frontier Kemper Construction of Pelham, NY. The size of the slide rail system installed was a 3 bay 4 sided pit, 65' long x 20.50' wide x 20'deep for the installation of several 30' long sections of 72 steel pipe on concrete cradle and wooden piles. Icon's Roller Rail System was chosen for it's unique ability to move up and down the face of the rail giving the contractor ...